Bathrooms
Walk-In Shower & Double Vanity Remodel
Overview
Horizon completed a full gut renovation of this Woodstock bathroom, removing every existing fixture and surface before rebuilding the space. Plumbing was relocated as part of the remodel. The walk-in shower was built with a custom tiled floor rather than a prefabricated pan.
A bathroom remodel runs about three weeks.
Every job is different, so your schedule may vary.
Scope of Work
Full bathroom remodeling including shower framing and construction, shower tile with a custom tiled floor, bathroom floor tile, double vanity installation, and interior painting, with plumbing relocated.
Services
- Complete bathroom gut renovation
- Plumbing relocation
- Shower framing and construction
- Custom tiled shower floor
- Shower tile installation
- Bathroom floor tile installation
- Double vanity installation
- Interior painting