Roofing
What Goes Into a Roof Replacement: A Two-Day Job in Woodstock
Brandon Turner3 min read
A roof tends to get attention only when something goes wrong. On this Woodstock home, storm damage, the age of the roof, and existing leaks pointed to a full replacement. Tear-off and installation took two days.
Why it needed a full replacement
Storm damage, age, and leaks added up. The decking in the valleys, where two roof slopes meet, was rotted, and it had to be repaired before new roofing could go on.
What the job included
The job started with a full tear-off of the old roof. From there, the scope included:
- Damaged decking repairs in the valleys
- New synthetic underlayment
- Ice and water shield in the valleys
- Starter strips
- GAF architectural shingles
- Ridge ventilation
- Pipe boots
- Chimney flashing
Valleys, flashing, and vents
A few spots on a roof do most of the work of keeping water out. Valleys collect water from two slopes, so the rotted decking there was replaced and ice and water shield was installed. Pipe boots and chimney flashing seal the places where something passes through the roof, and both were replaced. Ridge ventilation was added along the peak.
What this kind of project involves
A roof replacement like this one is a roof replacement project from tear-off to flashing. A few decisions shape the result:
- Repair or full replacement
- Condition of the decking, especially in the valleys
- Underlayment and valley protection
- Ventilation
- Flashing and pipe boots
- Shingle style
The result
The home now has a new GAF architectural shingle roof with ridge ventilation, repaired valleys, and new flashing and pipe boots.
Horizon Home Services is based in Cartersville and handles this kind of work across Bartow County and Northwest Georgia, including Woodstock.
From the blog
