Planning

Finishing a Basement: Drop Ceiling or Painted Exposed Ceiling?

Brandon Turner3 min read

Finished basement workspace with a Sherwin-Williams Denim built-in workbench, drop ceiling with recessed lights, and LVP flooring.

A basement is easy to picture finished and harder to plan. In a home in Marietta, the homeowner needed a dedicated workspace for her business and a separate room for storage. The starting point was exposed joists, a concrete floor, and a built-in workbench area. The project took about three weeks because the framing already existed. Framing or layout changes can add about a week.

What we started with

The main room had a long built-in workbench along one wall. Overhead, ductwork and plumbing lines ran along the joists. The second room was a narrow space with bare concrete walls.

The basement workspace before the remodel, with the built-in workbench.
The basement workspace before the remodel, with the built-in workbench.
Bare concrete basement walls before the remodel.
Bare concrete basement walls before the remodel.

What we built

The workspace got drywall, a drop ceiling with new recessed lights and HVAC vents, new outlets, LVP flooring, and baseboard. The original workbench stayed. We refinished it, painted it Sherwin-Williams Denim, and trimmed it out so it looks built for the room. The storage room got drywall, LVP flooring, and a ceiling painted black.

The original workbench, refinished and painted Sherwin-Williams Denim.
The original workbench, refinished and painted Sherwin-Williams Denim.

Two rooms, two ceilings

The drop ceiling covers the ductwork and plumbing in the workspace, and it carries the recessed lighting and vents. In the storage room we painted the exposed ceiling black instead. Both approaches work. Which one fits depends on how the room will be used and how much you want overhead to be covered.

The drop ceiling with recessed lights, before flooring.
The drop ceiling with recessed lights, before flooring.
The storage room with painted walls and a painted black ceiling, before flooring.
The storage room with painted walls and a painted black ceiling, before flooring.
Both approaches work. Which one fits depends on how the room will be used.

How the project came together

Carpentry and drywall came first. Then the drop ceiling, lighting, and vents went in along with the new outlets. Painting and flooring followed, and trim finished the rooms.

Drywall taping and finishing underway in the workspace.
Drywall taping and finishing underway in the workspace.
Taped drywall in the narrow room.
Taped drywall in the narrow room.

What this kind of project involves

A basement like this one is an interior renovation project and involves carpentry, drywall, electrical, HVAC, painting, and flooring. A few decisions shape the result:

  • Drop ceiling or painted exposed ceiling
  • Where ductwork and pipes run, and how they will be covered
  • Where lighting and outlets should go
  • Flooring type
  • How each room will be used

What drove the cost on this job: drywall, paint, floors, minimal electrical, and one painted ceiling instead of a second drop ceiling.

The result

The homeowner now has a finished workspace with a refinished built-in workbench, plus a separate storage room. A finished basement can add resale value depending on your local market.

The finished workspace with LVP flooring and baseboard.
The finished workspace with LVP flooring and baseboard.
The storage room with new LVP flooring and baseboard.
The storage room with new LVP flooring and baseboard.

Horizon Home Services is based in Cartersville and handles this kind of work across Bartow County and Northwest Georgia, including Marietta.

From the blog